Saturday Morning the contractor came to texture the ceiling and to fix the hole in floor. Well he showed up and textured the ceiling, and forgot to fix the floor.
We call Kami and the girls to come help us paint on Sunday, well we forgot/lost a few things. we made 3 trips to Ace Hardware. 1 for roller pads, 2 for a second roller and extension, 3 for paint for the ceiling. Dad was ticked!
Monday Lee's came in to flatten the floor. The additional charge is $3.50 pr sq ft!!!!!!!!!!!! We dont know if the price is in additional to the cost for the installation of $2.25 or if the total is $3.50? We dont know.
Tuesday Lee's came in to finish the floors and install the tiles.
Today nothing is happening, unless mom called the electrician to fix the Oven outlet
Pictures
Before
Before
In Progress
After the Leveling stuff is drying
Flooring Done
Flooring Done
Flooring Done
Wednesday, June 23, 2010
Friday, June 18, 2010
Days 4-6: Electrition/Contractor/PMT - Holy Hot!!
Wednesday the contractor came in to begin patching the walls.
The Electrician came on Tuesday to fix the problems that he created on Monday.
Thursday the contractor came in to do the second coat of mud on the walls and it was so cold in the house that the mud was not drying. so we had to jimmy rig the heater to kick on. Mom and I went to Twin about 3:30 yesterday and when we came home the temp inside the house was 85!! The contractor came in a few hours earlier and said the temp was over 100!
Today PMT is coming to fix the wires for the phones so we can have a phone downstairs. The contractor is coming to do another coat of mud and the re-texture the ceiling.
Mom found a great contractor! He is allways late, but does a great job.
Our electricians are a joke. the made several mistakes and still have not hooked up the heater with a new thermostat. Also PMT came in this morning to hook up a wire and found that the electricians cut a phone wire to the bedrooms so we are paying PMT to repair any crappy work that the electricians did to the phones.
The pictures show what the kitchen looks like now
The Electrician came on Tuesday to fix the problems that he created on Monday.
Thursday the contractor came in to do the second coat of mud on the walls and it was so cold in the house that the mud was not drying. so we had to jimmy rig the heater to kick on. Mom and I went to Twin about 3:30 yesterday and when we came home the temp inside the house was 85!! The contractor came in a few hours earlier and said the temp was over 100!
Today PMT is coming to fix the wires for the phones so we can have a phone downstairs. The contractor is coming to do another coat of mud and the re-texture the ceiling.
Mom found a great contractor! He is allways late, but does a great job.
Our electricians are a joke. the made several mistakes and still have not hooked up the heater with a new thermostat. Also PMT came in this morning to hook up a wire and found that the electricians cut a phone wire to the bedrooms so we are paying PMT to repair any crappy work that the electricians did to the phones.
The pictures show what the kitchen looks like now
Tuesday, June 15, 2010
Day 3 - Electrician Day 2 and Contractor Day 2
Ok, Yesterday the electrician came and they made several mistakes:
All and all they did a good job considering that they were here at 8:45 lunch from 11 to 12:30ish and left at 3:30 not bad for 5 hours and 15 minutes.
The Microwave outlets - Left one is Wrong, Right one is correct
Whet the H E Double Toothpicks is this one for??????
Kitchen before any electricians are reak havoc
The contractor is here to put drywall where the sofit was and to patch a few holes.
Tomorrow the electricians will be here around 8am (9am Electrician time) to fix the rest of the items and to add an air vent to the basement, filp a switch to the other side of a wall, and to install the new thermostat, and move the Oven Outlet.
- The new outlet for the microwave was put about 7-8 inches away from where it was supposed to be. (contractor fixed)
- Forgot to move the outlet for the range.
- Made a big mess of both sides of the wall by the stairs
- Added an extra socket or outlet, not sure which. wasn't suppose to be there in the first place
- General unbrainy electricians
All and all they did a good job considering that they were here at 8:45 lunch from 11 to 12:30ish and left at 3:30 not bad for 5 hours and 15 minutes.
The Microwave outlets - Left one is Wrong, Right one is correct
Whet the H E Double Toothpicks is this one for??????
Kitchen before any electricians are reak havoc
The contractor is here to put drywall where the sofit was and to patch a few holes.
Tomorrow the electricians will be here around 8am (9am Electrician time) to fix the rest of the items and to add an air vent to the basement, filp a switch to the other side of a wall, and to install the new thermostat, and move the Oven Outlet.
Monday, June 14, 2010
Day 2 - Electrician
Today the Electricians are here doing the new outlets and switches
Pictures to come later
Pictures to come later
Friday, June 11, 2010
Kitchen Remodel Day 1 - Bye Bye cabinets and floors - part 2
while I was at work, the work at home still went on
Ok, so instead of me posting endless amounts of pictures here i will post the pictures to a gallery page.
Here is the link to the gallery
http://gallery.me.com/colbyotte#100134
Ok, so instead of me posting endless amounts of pictures here i will post the pictures to a gallery page.
Here is the link to the gallery
http://gallery.me.com/colbyotte#100134
The Kitchen Day 1 - Wall go Bye Bye - Part 1
Thursday, June 10, 2010
The New Otte Blog UPDATED
Welcome to the Otte Blog! We will be posting what happens to us, from a new kitchen to the Hershey's Vet trips. Come back soon for the Kitchen updates.
UPDATE: Meeko not Hershey needs to go to the vet for her shots
UPDATE: Meeko not Hershey needs to go to the vet for her shots
Subscribe to:
Posts (Atom)